At the moment 14th January 2016 there are 2 control units off being repaired/replaced.
These are 119 and 128 getting new batteries. Control 40 which was stolen at Boscombe has been replaced today.
Alan H.
At the moment 14th January 2016 there are 2 control units off being repaired/replaced.
These are 119 and 128 getting new batteries. Control 40 which was stolen at Boscombe has been replaced today.
Alan H.